How to Estimate Cabinetry Cost: Step-by-Step Guide

Quick Answer

To estimate cabinetry cost: take off quantities (cabinet counts and lf), price materials (Cabinet boxes, Drawers and doors, Hardware), apply your burdened labor rate ($45-85/hr (installers)), add 10-20% overhead and 5-15% profit, then sanity-check against typical Cabinetry ranges ($150-400/LF/stock cabinetry, $400-1,000/LF/custom cabinetry, $15-60/EA/hardware).

Key Takeaways

  • Estimating cabinetry cost = quantities × (material + labor) + overhead + profit.
  • Use your actual $45-85/hr labor rate, not national averages.
  • Reference Cabinetry costs: $150-400/LF/stock cabinetry, $400-1,000/LF/custom cabinetry, $15-60/EA/hardware.
  • AI takeoff does the quantity step in minutes; pricing stays yours.

Step-by-step: how to estimate Cabinetry cost

  • 1. Take off quantities. Measure cabinet counts and lf and other cabinetry scope from the plans (AI takeoff reads PDFs in seconds).
  • 2. Price materials. Get real quotes for Cabinet boxes, Drawers and doors, Hardware, Shelving — not list prices.
  • 3. Apply labor. Use your burdened cabinetry rate ($45-85/hr (installers)).
  • 4. Add waste. 5-15% typical for cabinetry materials, per your actuals.
  • 5. Add overhead and profit. 10-20% overhead, 5-15% profit — from your books.
  • 6. Sanity-check. Compare per-unit to the ranges below; investigate any outlier.

Cabinetry cost reference

ItemTypical rangeUnit
Stock cabinetry$150-400/LF
Custom cabinetry$400-1,000/LF
Hardware$15-60/EA

Worked example

For a mid-size cabinetry scope, multiply your quantities by the material and labor rates above, add waste, overhead, and profit, then divide by the relevant unit. Compare the result to the $150-400/LF range for stock cabinetry. If you are far off, find out why before you bid.

Frequently Asked Questions

How do you estimate Cabinetry cost?

Take off quantities from the plans, price material and labor per your local rates, add overhead and profit, then compare the per-unit total to the ranges here. AI takeoff speeds the quantity step from hours to minutes.

What labor rate should I use for Cabinetry?

Use your actual burdened labor rate for your market — $45-85/hr (installers). Burden includes taxes, benefits, and overhead on top of base wages.

How much waste should I add for Cabinetry?

Waste factors vary by material and trade — typically 5-15% for cabinetry materials. Use your historical actuals; generic factors are a starting point only.

What overhead and profit should Cabinetry bids carry?

Overhead commonly runs 10-20% and profit 5-15%, but set both from your own books and the project's risk — not rules of thumb.

How accurate are the Cabinetry ranges here?

They are general industry benchmarks for planning. For a defensible number, take off the actual plans and price with your local vendor quotes and labor rates.