HVAC takeoff sheet: equipment, duct and accessories

An HVAC takeoff sheet has to hold four kinds of quantity apart: equipment counted by tag, duct measured in linear feet, accessories counted each, and connections that belong to somebody else. A register that lets those share one column produces a total nobody can price. Keep the system number, the tag, the specification reference and the unit on every row, and let the review column say who checked it and against which drawing. The downloadable CSV below carries three labelled example rows: 2 assumed pieces of equipment, 40 assumed linear feet of duct and 6 assumed terminals. Those values exist to show the unit discipline. They are not measured project quantities, and they are not a design. Sizing, airflow and load calculation come from the project documents and from the engineer who prepared them, never from this sheet.

By CyanBuild. Figures checked .

Matching each equipment tag to the schedule it was counted from

An equipment count is only as good as the reconciliation behind it. Take the tags shown on the plan, match each one to the row of the equipment schedule that describes it, and record the schedule reference on the row. The two documents disagree more often than they agree. A unit appears twice on the plan because it is called out on a riser diagram and again on the floor plan. A unit in the schedule is existing equipment that the drawings show only as a dashed outline. A unit is a future or an alternate item. Count each of these once and label the condition, because a count that mixes existing and new units answers a different question from the one a supplier will quote. Keep capacity and model as references to the schedule rather than as values typed from a symbol. A symbol carries no capacity, and the number printed beside it is usually a tag. When the plan and the schedule cannot be reconciled, keep the row open and flag it.

Keeping duct length, duct surface area and duct weight apart

Duct quantity appears in three units and they are not interchangeable. The linear foot is a routing measure: how much centreline the run occupies. The developed surface area is what a fabricator or a coating supplier bills from, because sheet gauge and seam count follow the perimeter. The weight is what a hanger and a rigging plan need. A register that carries one column and labels it duct produces a number that prices correctly for one of these three and badly for the other two. Write the unit on the row. Record the centreline length for the run, the size and gauge for the segment, and keep the developed area as a derived figure with its own column rather than a footnote. SMACNA publishes the HVAC Duct Construction Standards for metal and flexible duct as a fourth edition work covering how duct is fabricated and installed, and the gauge, the reinforcement and the seams it prescribes are what set the weight of the finished piece. Split a run wherever the size changes.

Counting terminals, dampers and accessories each on their own line

Everything that is not a length of duct and not a piece of equipment is usually an accessory, and accessories are counted. Supply and return diffusers, grilles, registers, volume dampers, fire dampers, smoke dampers, balancing dampers, mixing boxes and access doors each carry a count and a specification. Give each family its own rows with a count unit beside them, because a supply diffuser and a return grille are different products at the same count. Where the drawings give a tag for a terminal, carry the tag onto the row so the count can be checked against the schedule. Where a damper appears on a duct segment, it belongs on the segment row as a count beside the length, never as a length of its own. SMACNA lists the HVAC Duct Systems Inspection Guide as a fourth edition work reviewing materials, reinforcement, assembly and supports, which is a useful reminder that the counts a takeoff produces are the visible part of what a duct system needs.

Recording the size and gauge that a duct rate needs

A linear foot without a size is not a quantity. Record the duct dimensions on the row: for rectangular duct the width and the height in inches, for round duct the diameter. Add the gauge or the material construction, because spiral and flexible duct do not carry the same rate as rigid sheet. A register with one duct row accumulates every size in the project into a single length, and that total prices to nothing. Split the runs by size, by construction and by pressure class where the specification names one, and keep the splits visible on the sheet. Where a different sheet or a revision gives a different size, the row that changes carries the newer reference and a note explaining it. Where the size is absent from the drawing, the row stays open, because a length without a size is a different order of estimate from a length with one. SMACNA's Fibrous Glass Duct Construction Standards, listed as an eighth edition, exist because construction is a specification matter.

Reading the sections for the routing that changes a quantity

The plan view shows where a run goes. The sections show what happens on the way. A duct that changes level, crosses a beam, passes through a sleeve or drops below a slab changes its length, and none of that appears in a horizontal cut. Read the sections and details for the routes that carry most of the length, and record the added vertical drop or rise as its own row with the drawing reference. The same applies to the offsets and transitions the plan abbreviates. Coordinate the mechanical layout against the structural and architectural drawings where the two sets differ, and record the difference in the review column instead of adjusting the number quietly. An equipment count that is right and a duct length that is short is a common outcome of reading one drawing set. Section references are also how a reviewer checks a run, so a row that cites only a plan sheet for a route the plan cannot fully describe is a row that will be questioned.

Listing controls, testing and commissioning work separately

Part of the mechanical scope never appears as a count on a drawing: control wiring, thermostats, sensors, control panels, balancing, testing and commissioning, and the connections to equipment supplied by another party. These belong on the register with their own units and their own references, and they are usually the items that disappear between a material takeoff and an installed price. Where the drawings show them, cite the sheet. Where the scope documents assign them, cite the section of the specification that assigns them. Record exclusions as carefully as inclusions, because the gap between two bids is often a line that one party left out. The United States Department of Energy establishes energy-efficiency standards for certain appliances and equipment and currently covers more than 70 different products, and it points to ANSI/ASHRAE/IES Standard 90.1-2016 for buildings. Those documents govern performance once equipment is installed. They do not tell you how many terminals the project has.

Handing a duct quantity to a fabricator

A fabricator prices a duct list, and a duct list needs sizes, lengths, quantities, material and the fittings, plus the connection type at each termination. Give the counts of elbows, tees, reducers, transitions, takeoffs and caps as counts, and keep them separate from the straight-run length so that fabrication and field installation can be priced differently. Note the pressure class or the gauge requirement and the connection type, because a flexible connection and a rigid flange are priced apart. State the delivery conditions and the access constraints the shop needs to know. SMACNA publishes an Architectural Sheet Metal Manual alongside its HVAC duct standards, and both describe duct as a constructed assembly rather than a length, which is the same distinction the register has to make. Where the register cannot answer a question a shop would ask, the missing information belongs in the review column.

What can you download and adapt?

A plain CSV worksheet you can open in Excel or another spreadsheet application. The values below are illustrative inputs, not measured project data. The CSV contains static values; it does not include formulas, macros, engineering checks or prices.

Sample quantities only. No design calculations or current rates are supplied.
DrawingSystemTag or itemSpecification referenceUnitQuantityReview status
Example onlySystem AEquipmentConfirm scheduleEA2Illustrative
Example onlySystem ADuctConfirm size and unitLF40Illustrative
Example onlySystem ATerminalConfirm scheduleEA6Illustrative

The address receives the worksheet and occasional estimating notes. No account is created and no password is set.

What does CyanBuild software cost?

These are CyanBuild’s published software plans as checked on October 6, 2026. Each allowance is for PDF pages per month. You review the quantities; an outsourced takeoff service is a separate purchase.

Published monthly plans in USD. Source: CyanBuild pricing.
PlanMonthly pricePDF pages / month
Free$03
Starter$2930
Pro$99120
Enterprise$299400

Paid subscriptions renew according to their terms. A page allowance does not guarantee the completeness of a takeoff, and unused capacity does not turn the subscription into a per-project service. Check current features and terms before choosing a plan.

What else should you check?

Is this sheet an HVAC design calculator?
No. It organises takeoff quantities so that each line can be reviewed against a drawing and a schedule. Loads, equipment sizing, airflows and design requirements come from the responsible design process and from the project documents. The sheet has no formulas for any of them, and the sample rows are labelled illustrations rather than design outputs.
Can duct length and equipment count be totaled together?
No, because their units differ. A linear foot and an each are different quantities, and adding them produces a figure that no supplier can price and no reviewer can check. Keep the unit on every row and aggregate only quantities that share a unit, an assembly and a specification. The worksheet example shows equipment, duct and terminals as three rows precisely so that they never collapse into one number.
What should I do when a plan tag does not appear in the equipment schedule?
Keep the row open and record the discrepancy in the review column with the plan reference that produced the tag. The tag is evidence that something is on the drawing, and the absence from the schedule is evidence that the two documents have not been reconciled. Resolving it belongs to the design team, because deciding on your own whether the unit is a duplicate, an alternate or an omission changes the quantity you will be quoted.
How do I handle a duct run whose size changes part way along the route?
Split it into separate rows at the change, each with its own size, gauge, length and drawing reference. A single row that averages two sizes gives a fabricator no information about either. The two rows can still be tied together with a note so a reviewer sees that they form one continuous run, and the total length for the run can be checked by adding the two rows. Keeping the split visible also shows where the extra fittings sit.
Does the sheet include a leakage test, balancing or commissioning allowance?
No. Those are scope items with their own units and their own references, and they belong on the register as named rows rather than as a percentage on a duct row. The sheet has no default allowance of any kind built into it. Where the specification assigns testing and balancing to another party, record that assignment in the review column so the exclusion is visible to anyone comparing the register with a bid.
Why does the example show 40 linear feet of duct and 6 terminals at the same time?
Because a real mechanical scope contains all three kinds of row at once, and the worksheet has to hold them together without merging them. The 2 assumed pieces of equipment, 40 assumed linear feet of duct and 6 assumed terminals are illustrative teaching values chosen to make the units visible. They do not describe a project, a building or a system, and the arithmetic in them carries no information about the equipment or the duct that any real job would use.
Can I use the same sheet for a plumbing scope?
The structure would hold the rows, but the product, unit and review rules are mechanical ones and they do not transfer. Plumbing runs are sized and routed against a different set of documents, and pipe lengths, fittings and fixtures each have their own unit conventions. Use the sheet for what it was built to hold: tagged equipment, sized duct in linear feet and counted accessories, each with a specification reference a reviewer can open.

Where do the figures and product facts come from?

Sources checked November 9, 2026. Published prices can change; verify the actual terms before purchasing. Worked examples on this page are labeled separately from published product or service facts.

Check a drawing before you choose a plan.

Create an account, upload a representative PDF and compare the draft quantities with your drawing.

Create a free account