Skip to content
CyanBuild

Roofing takeoff template: roof planes, edges and order units

A roofing takeoff template has to keep the roof geometry, the covering product and the accessory lengths apart, because one area figure answers none of the three questions a supplier asks. Record each plane separately, record the basis of the area beside the number, and keep ridges, hips, valleys, rakes, eaves, flashings and penetrations on rows that carry their own units. The downloadable CSV below carries one labelled example: Plane A, 1,200 square feet, with the edge length left for entry and no allowance supplied. Those figures exist to show the structure of the register. They are not a measured roof, a slope calculation or a recommendation. Geometry, coverage rates and laps come from the drawings and from the documentation of the product you have selected.

By CyanBuild. Figures checked .

Recording the area basis next to every square-foot figure

A square-foot number without its basis cannot be checked, and the basis is the first thing a supplier asks for. Write down whether the figure is a plan area taken from the footprint, a sloped surface area derived from a pitch, or a developed area taken from the manufacturer's dimensions. Where the drawing supplies true sloped dimensions, use them and say so, because multiplying a plan area by a slope factor on top of a dimension that is already sloped overstates the roof. Where a pitch has to be assumed, record the assumption and the reason in the area basis field rather than in a note elsewhere. Keep each plane on its own row, because a roof made of several planes is a set of separate measurements, and a single total hides which plane carries the complexity that drives the accessory quantities.

Separating ridge, hip, valley, rake and eave lengths

The linear accessories on a roof are priced by length and they are the items most often left out of a roofing takeoff. Ridges, hips, valleys, rakes, eaves, drip edges, aprons, valley metal, step flashing and counter-flashing each carry their own linear measurement, and each is quoted against a different product. A rake is not a valley, because the product is not the same, and a drip edge runs along a different edge from a rake. Measure them from the plan and from the details, keeping the pitch in mind, because the length of a sloped edge is longer than its horizontal projection. Where the drawings do not dimension an edge, record it as a measured quantity to be taken in the field and keep the unit visible, rather than folding it into the area row. The pitch factor and its limits are covered in the separate roofing takeoff calculator guide.

Counting penetrations, curbs and flashings by the unit each is sold in

Penetrations are sold each. Plumbing vents, stacks, equipment curbs, hatch openings, skylights, roof drains and satellite mounts each take a flashing or a curb kit, and a single count of penetrations does not describe which of those items the number covers. Give each family its own row with a count unit beside it and the detail reference that produced it. Where a curb has a known dimension, record it, because a curb is priced by its size and its material as well as by its count. Where the same penetration appears on more than one sheet, confirm it once and note the sheets. Where a detail shows a pipe boot and a storm collar on the same penetration, those are two items and two rows, and a count that merges them will not reconcile against the submittal.

Distinguishing the deck, the underlayment and the covering

A roof assembly is a stack of layers and each layer has its own unit. The deck is measured in square feet, or in sheets where it is a board product, and the underlayment, the starter strip, the base sheet and the covering are separate measured or counted items. A register that holds only the top layer loses the replacement cycle, because a roof that is specified with a two-layer assembly cannot be ordered from one square-foot figure. Record each layer on its own row with its product and its coverage basis, and note where a layer applies to only part of the roof. Where the assembly depends on wind uplift performance, the accessory choices change with it, and NRCA points to the ANSI/SPRI/FM 4435/ES-1 and ANSI/SPRI GT-1 test standards when it discusses wind-resistance testing of edge metal on low-slope membrane roofs.

Reading the roof wind and uplift requirements into the accessory list

The roof area is not the only quantity that shapes the accessory list. The design wind load for the building affects the fastening, the edge metal and the attachment of the perimeter, and ASCE/SEI 7 is the standard the American Society of Civil Engineers publishes for minimum design loads and associated criteria, with the 7-22, 7-16 and 7-10 editions listed on its site. NRCA publishes a Roof Wind Designer for determining roof system design wind loads for common building types, and its codes and standards section points to the International Building Code and the International Residential Code, which it says are published on a three-year update cycle. Read the wind and the code references that apply to the project before finalising the accessory rows, because the perimeter quantities follow from them.

Checking the slope before converting a plan area into a surface area

Slope changes every area on the roof, and it changes the accessory lengths as well as the surface area. Establish the pitch for each plane from the section or the roof plan, and record the pitch in the area basis field. A plane at one pitch and a plane at another are different rows with different factors, and a building with two pitches cannot carry one factor. Where a roof drains to internal drains, the low points and the drainage area matter, because they determine which planes receive additional material. Where the covering is a membrane, NRCA publishes an EnergyWise Roof Calculator as a graphical method for building roof assemblies to evaluate thermal performance and estimated energy costs under normal operating conditions, which is a reminder that the assembly above the deck carries decisions the takeoff only records.

Building the product request a supplier can answer

A roofing request that carries a square-foot total and nothing else comes back with questions. Give the supplier the covering system, the required products with their layers, the measured units, the site location, the delivery and access requirements and the drawing revision the measurement came from. List the accessories and the penetrations on their own rows so the answer can be priced line by line, and state who is responsible for checking compatibility between the covering, the underlayment and the flashings. NRCA separates testing standards, which define test methods and minimum acceptable results, from rating standards, which establish measurement methods for a fair comparison of products, and from design standards, which detail the criteria for a specific roof system. Keep quote validity and exclusions beside the rate, so two answers can be compared.

What can you download and adapt?

A plain CSV worksheet you can open in Excel or another spreadsheet application. The values below are illustrative inputs, not measured project data. The CSV contains static values; it does not include formulas, macros, engineering checks or prices.

The sample area is illustrative. Verify actual roof geometry and product coverage.
DrawingRoof planeCovering specificationArea basisMeasured SFEdge LFOrder allowance note
Example onlyPlane AConfirm specificationSurface area after geometry review1200Enter measured lengthNo allowance supplied

The address receives the worksheet and occasional estimating notes. No account is created and no password is set.

What does CyanBuild software cost?

These are CyanBuild’s published software plans as checked on October 6, 2026. Each allowance is for PDF pages per month. You review the quantities; an outsourced takeoff service is a separate purchase.

Published monthly plans in USD. Source: CyanBuild pricing.
PlanMonthly pricePDF pages / month
Free$03
Starter$2930
Pro$99120
Enterprise$299400

Paid subscriptions renew according to their terms. A page allowance does not guarantee the completeness of a takeoff, and unused capacity does not turn the subscription into a per-project service. Check current features and terms before choosing a plan.

What else should you check?

Does the CSV calculate the roof slope?
No. It is a worksheet for entering and reviewing quantities. Determine each roof plane from the drawings and confirm the pitch or the actual dimensions before entering a surface area, and record the basis in the area field. The separate roofing takeoff calculator guide works through the slope factor method for a single uniform pitch, and it explains why a drawing that already gives true sloped dimensions must not be multiplied again.
How do I decide whether to measure plan area or sloped surface area?
Use the basis that the product and the drawing support, and record which one you used. Plan area describes the footprint. Sloped surface area describes the material the covering has to cover, and it is the larger figure for any pitched plane. Where the drawing gives true sloped dimensions, use them directly. Where the pitch must be applied to a plan area, record the pitch in the area basis field so a reviewer can repeat the calculation and check it.
Should penetrations be deducted from the roof area?
Decide once and record the decision, because the two conventions produce different totals and different orders. Where the covering is a membrane and a penetration is flashed, the material is usually taken around it rather than removed from the area, and the flashing is counted separately. Where shingles are cut around a chimney, the cut waste is usually carried as an allowance rather than as a deduction. Whichever convention you use, keep it consistent across the register and note it beside the area column.
How do I record an allowance for waste without contaminating the measured area?
Keep the measured area in its own field and add the allowance as a separate row that names the percentage and its basis. The example on the worksheet carries 1,200 square feet with no allowance supplied, and the note under the table says so. An allowance added twice, once to the area and once to the order quantity, is a common failure and it is invisible once the two numbers merge. The separate row is what lets a reviewer see the difference between the roof and the purchase.
Why does the example leave the edge length blank?
Because the edge lengths are measured quantities and the sample row has no drawing to measure them from. An illustrative area of 1,200 square feet says nothing about how many linear feet of ridge, rake or valley the roof has, and inventing a figure would give the row a number that looks measured. Enter the edge length from the plan and the details when you have the drawing, keeping the unit on the row so a supplier can price it against the area.
Can an automated symbol count give me the roof area?
No. A count of roof penetrations or a count of plan elements is not a surface area, and geometry has to be established from the drawing before any area exists. The pitch, the slope factor and the eaves all change the figure, and none of them can be read from a symbol. Count what can be counted, such as penetrations and curbs, and take the area from a reviewed measurement of each plane with its basis recorded.
Does the worksheet include the underlayment and the deck?
It can hold them, as separate rows with their own units. The register does not prescribe what the scope contains, so add a deck row, an underlayment row and a covering row and give each a product and a coverage basis. A roof assembly with more than one layer cannot be described by a single square-foot figure, and the replacement value of the assembly is lost if the layers are merged. Keep the deck out of the covering row so a supplier can price the two materials separately.

Where do the figures and product facts come from?

Sources checked November 9, 2026. Published prices can change; verify the actual terms before purchasing. Worked examples on this page are labeled separately from published product or service facts.

Check a drawing before you choose a plan.

Create an account, upload a representative PDF and compare the draft quantities with your drawing.

Create a free account